BIM Projects
Do you have a BIM project and you want to optimize your resources?
HOTEL IN BARCELONA
Basic, Executive and As Built Project of the restoration of a Hotel in the province of Barcelona.
BIM modeling of the architecture, of the installations and the layout of the floor plans.
Architecture & Facilities
Imagénes interactivas
Vista de 360º Instalaciones y estructura en cubierta
INTERACTIVE IMAGES
Having a 3D model of the facilities, allows you to avoid design errors because you can visualize all elements, analyze collisions and modify important layouts before starting the work.
You can move the angle of the view by clicking the mouse.
Architect:
Victor Catalán, Ovidi Alum
Interior Design:
Maria Gelpí
BIM Manager:
Gustavo Martínez
HOTEL IN SANTA SUSANNA
Basic, Executive and As Built Project of the restoration of a Hotel in the Maresme region.
BIM modeling of the architecture, structure, facilities and floor plan layouts.
Hotel in Barcelona
Basic, Executive and As Built Project of the renovation/expansion of the Hotel.
BIM modeling of architecture, structure, facilities and layout of the floor plan.
OTHER PROJECTS
During my collaboration with A3D I have participated as project manager in the following projects:
INEFC
National Institute for Physical Education of Catalonia.
- BIM Architecture Model.
- Model coordination with point cloud -laser scanner-.
- Responsible for training in-house staff.
SABADELL ATLANTIC TOWER
Office Building Modeling, 24 floors above ground and 6 basements.
- BIM modelling of the architecture and the facilities (technical rooms and vertical stairs).
- Coordination of cloud-point modelling.
"ZONA FRANCA" APPARTMENT BUILDINGS
Modelling of Office Building, 184 appartments distributed in three blocks of 8 floors, Common Areas, Commercial Premises and 2 floors for parking.
- BIM modelling of architecture and facilities (technical rooms included)
- Linking the model with photographic report.
On-site monitoring.
SANT FELIU DE LLOBREGAT TOWN HALL REFORM
Modelling of the Office Building.
- BIM modelling of the Architecture and Facilities.
- Incident management through the BIM Sync platform
- Parameters and completion of the specifications.
Parameter’s Import/export to IFC.
PASQUAL MARAGALL FOUNDATION REFORM
Modelling of the Office Building.
- BIM modelling of Architecture and facilities.
- Parameters and completion of the specifications.
- Import/export of parameters in xlsx format.
- Automation design in Dynamo.
COORDINATION OF THE MODELLING PROCESS OF THE APPARTMENT BUILDING IN MOLINS DE REI.
- Control of the BIM architecture modelling process and facility coordination.
- Parameters and completion of the specifications.
- Coordination of wooden building -56 Appartments-
COORDINATION OF THE MODELLING PROCESS OF APPARTMENT BUILDING IN BARCELONA.
Control of the BIM Architecture Modelling Process and facility coordination.
- Parameters and completion of the specifications.
- Increasing the level of detail from the LOD350 model to a LOD450 building model.
- Implementation – Training
- Implementation and training of various engineering, architecture and industrial firms.
Implementation and personalized training
Implementation and training of various engineering, architecture and industrial firms.